Engineering Consulting Service

RPE services for UDS and COC as per ASME section VIII division 2 for U2 stamps.

CRN number registration consulting for pressure equipment and fittings exported to Canada.

Structure welders, WPQ, welding manufacturing shop and construction field, WPS,PQR documentation, welding inspection personnel certificates consulting as per CWB,ABSA and TSSA.

API Monogram Program consulting for API 5L, 5CT,6A, 6D, Q1, Q2

API certification and its significance

With the development of China's oil and gas industry, foreign cooperation and exchanges have become extensive, and more Chinese equipment manufacturing and service enterprises are participating in market competition. API certification has been become one of the main means of competition to obtain foreign orders and even gain domestic market share, not just by relying on local production - "Made in China".


Third Party Inspection Services

We provide third party inspection services to shop, installation, trial test in manufacturer and on construction site. Based on RBI of shut-down, in-service inspection and corrosion monitoring of operation equipment at petrochemical plants, including but not limited to:

  • Boiler and fired heater/furnace
  • Press vessel (including heating-exchanger and tower)
  • Storage tank
  • Piping and pipeline
  • Piping and accessories/ fitting, valve, instrumentation, electrical appliances
  • Onshore/Offshore Steel structure - Civil, and welding – Module, Shipyard
  • Power equipment(Compressor, pump, fan, wind power generation equipment)
  • Human resources - team supply for critical international EPC projects.

Certification and Training Services

Certifications and standards training as per the clients’ requirement including on-line courses and in-house training:

  • API Source Inspection Training
  • API 653 and 650 Tank inspection code training
  • Canadian welding Bureau: CWB inspection personnel certificate examination and training
  • ASME Section VIII Division 1 Pressure vessels code training
  • ASME B31.3 Process piping code training
  • API 510 and 572 Pressure vessel inspection codes training
  • API 570,574 Piping inspection codes training
  • Inspection and evaluation report writing skill for project/plant facilities and/or equipment including the mitigation or repair method

Pipeline Inspection and Integrity Services

Cooperate with our partner - Alberta NDE & Pipeline Services Inc., we provide the following services:

  • Pipeline pressure Testing
  • Pipeline Integrity & Maintenance
  • Phased Array & TOFD Flaw
  • Remote control crawlers & UAV/drone

Project management

Professional services worldwide to provide specific project management, support and consulting services to clients' specific needs:

  • Quality Assurance Manual development, preparation, and review.
  • Development and application of specific non-destructive testing (such as in-line internal magnetic flux leakage testing of long-distance pipelines).
  • Bidding for quality, schedule and price control in international EPC projects.
  • Development and application of RBI's risk-based inspection for plant equipment maintenance and overhaul management software.

2022:

Manufacture residence inspection: CSA W47.1 & W59 Cantilever Sign Structure for Alberta Transportation - Highlighter Weifang:: Whitemud Drive WB Project including material traceability, production process monitor, DT specimen witness to Acuren and NDT, welding monitor and inspection, VT, and final marking, package and shipment..

PTA Dryer design certification reversion and quality inspection in RBQ Canada.

53 Feet LNG tanks design certification and quality inspection in the provinces of Quebec Canada.

Residence inspection on the structure steels of Pattullo Bridge Replacement Project manufactured by CRSBG per project specification.


2021:

Final inspection and process random check and control of welding quality and nondestructive inspection (VT, NDE) of platform forSuncor Coke Boiler Replacement (CBR) Project at MHIC Taicang/Zhangjiagang shop.

Final inspection and process random check and control of welding quality and nondestructive inspection (VT, NDE) of platform forSuncor Coke Boiler Replacement (CBR) Project at YHHI Yantai shop.

Provide RPE service for MDR & UDS with U2 stamp 6000 cubic LPG spherical tank of Thilawa.

Training of API 653.

Compressor tanks design certification and quality inspection in all the provinces of Canada.

LNG tanks design certification and quality inspection in all provinces of Canada.

Internal training of API 510.

Absorber design certification and quality inspection in the provinces of Nova Scotia ACI Canada.


2020:

Compressor tanks design certification and quality inspection in QC Canada.

LNG tanks design certification and quality inspection in ON and AB of Canada.

Internal training of API 653.

RPE services for Guard filters installed in Water Management System (Phase 1) for PETRONAS Carigali Iraq Holdings B.V.’S Garraf Operation as per ASME Sec. VIII Div.2.

Manufacture residence inspection: CSA W47.1 & W59 Cantilever Sign Structure for Alberta Transportation - Vlamont Westcost Eng.: Southwest Calgary Ring Road Project including material traceability, production process monitor, DT specimen witness to Acuren and NDT, welding monitor and inspection, VT, and final marking, package and shipment..

Manufacture residence inspection: CSA W47.1 & W59 Canti ever Sign Structure for Alberta Transportation - Vlamont Westcost Eng.: Peace River Cantilever Project, Strugeon County SS Hwy 643 Project including material traceability, production process monitor, DT specimen witness to Acuren and NDT, welding monitor and inspection, VT, and final marking, package and shipment..

Ships overhaul inspection supervisor for Applus.

API 5L offshore Pipe piles site assemble inspection supervision

Welding QA/QC on structure steel offshore dock in North Vancouver for pulp mill expansion project.

Welding QA/QC on structure steel onshore shop in North Vancouver for pulp mill expansion project.


2019:

Installation supervision of PCC SAGD project of PetroChina Canada Engineering Company in Phoenix module construction site, including container, storage tank, pipeline.

Installation supervision of PCC SAGD project of PetroChina Canada Engineering Company in Phoenix module construction site, including electric heating tracing tube.

Installation supervision of PCC SAGD project of PetroChina Canada Engineering Company in Phoenix module construction site, including insulation, cladding and banding.

Internal training of API 570.

On behalf of HAC, final inspection and process random check and control of welding quality and nondestructive inspection (VT, NDE) of air cooler steel structure managed by Fluor for IPL project at CPECC Qingdao CWB shop.

Technical support for downtime maintenance of several OGDCL plants in Pakistan including large oil tanks.


2018:

On behalf of the EPC Fluorr - Moody, supervised the manufacturing/assembly of gate valves for RAPID project of Petronas, at Velan headquarters plant in Montreal (ASME N nuclear power component stamping) (including VT, NDE).

Provide RPE service (including fatigue analysis audit) for UDS and MDR with U2 seal for 3000 cubic LPG coated bullet storage tank of Bangladesh Dacca MGJ project.

To apply for CRN registration for 2 sets of pressure vessels of Tofflon company in Kingston, Canada, and provide drawing review and registration agency services.

Provide RPE service (including fatigue analysis audit) for UDS with U2 seal for 4 sets of 6000 cubic propylene ball cans of Petronas.

Provide RPE service (including fatigue analysis audit) for MDR with U2 seal for 4 sets of 6000 cubic propylene ball cans of Petronas.

For Shanghai First Refrigeration Co., Ltd. 2 sets of heat exchanger in Quebec, Canada to apply for CRN registration for drawings review and registration agency services.

Entrusted by LR, applied for CRN registration for 10 pressure vessels of Morsen Kangsheng company in BC Province of Canada for drawing review and registration agency services.

Internal training of API 579 / ASME FFS.

QA QC NDE aud it on the welded power poles as per CSA W59 @ HJT for Sask power N015 Project.


2017:

Internal training of API 580 RBI.

AMEC Foster Wheeler Jiangmen (ASME “S” stamp holder): 1x 105 MW Coal Fired Power Project- Philippines Alsons /Arangani. Steam Generator residence inspection for JGC as per ASME Section I.

In-service inspection on the large CS tanks and piping as per API 653 and 650 for International Paper 2017 Fall TAR Project.

Residence inspection on air coolers @ Kelvin as per ASME section VIII division 1 (U stamp) for TenjizChevr Oil FGP Project.

In-service inspection on SS vessels, piping and rotation equipment as per API 510, 570 and ABSA for International Paper 2017 Fall TAR Project.

ECA analysis on the welded power poles as per CSA W59 @ HJT for Sask power N015 Project.

Entrusted by Hongguang company, provided services of drawing review and registration agency for two absorbers applying for CRN registration in ACI area of Canada.

Morocco Jerada 1x 350 MW Supercritical Coal Power Plant Project: ASME Sec.I PG-16.2 design review of the pressure system by PE for SEPCO III - LR.

Fortis BC Tilbury 2 LNG Tank (40,000m³) Project: API 620 / 625 QC inspection - welding monitor per WPS by Bechtel / Ideals Welders Ltd.; RT film review; PT, Vacuum box test, VT, Hydro test, Settlement test monitor and document handover.


2016:

Ruskin Dam Air Lines Project: ASME B31.3 power piping VT and PT shop inspection at Jewel Holdings Ltd.

Prosernat Argentina Campana Refinery Project SRU: API 936 refractory shop inspection on the incinerator, stack at Lmart for Callidus UOP - Honeywell.

Prosern at Argentina Campana Refinery Project SRU: API 936 refractory shop inspection on the burner chambers at Rutai for Callidus UOP - Honeywell..

Prosern at Argentina Campana Refinery Project SRU: API 936 refractory lab witness inspection on the incinerator, stack and burner chamber for Callidus UOP - Honeywell.

BC Hydro: API 5L, ASME B31.3 and CAS W59 shop inspection on the pipes and structure at Advanced Flow Systems.

Fortis BC Tilbury 2 LNG Expansion Project: ASME B31.3 QC piping inspection - welding monitor per WPS by Bechtel / Ideals Welders Ltd.; VT, MT, PT and document handover.

Internal training of API 653.

Bao steel steel structure: supervised by Fluor, provided CWB welding inspection and CGSB NDT for steel structure for Fort Hills project of Suncor Canada in Modern shops.


2015:

Internal training of API 571.

Bao steel steel structure: supervised by Fluor, provided CWB welding inspection and CGSB NDT for steel structure for Fort Hills project of Suncor Canada in Songwei shops.

Yanda (Haimen) Module Yard: As Air Liquide appointed - the third party inspection to inspect the quality (welding) inspection of U stamp pressure vessels and heat exchangers manufactured by Korea Sewon in accordance with ASME VIII-1 for Red water project Unit 40 of NWR Canada..

Third party inspection for Suncor Canada Forthills Project in MHIC Taicang, China for structure steel quality surveillance including CWB welding & coating inspection.

Third party inspection for Suncor Canada Forthills Project in Sunhel Nantong, China for structure steel quality surveillance including CWB welding & coating inspection.

Internal training of API SI Source Inspection.


2014:

Internal training of API 510.

Husky Rainbow lake (Canada) gas process plant spring shut down inspection services per API 510 , 570, 653 and 580.

Refinery of Qingdao for Sinopec: Mechanical Integrity Consulting services for vessels, tanks, piping, pressure safety valves, pre - startup procedures, and internal training for API 580, 581, 510, 570.

API 5L PSL2 X 80 SAWL Line Pipe (bare) for The Third Line of UZBEKISTAN-CNPC G as Pipeline Project in Baosteel Shanghai including material traceability, production process monitor, DT and NDT, welding monitor and inspection, VT, inspection.

API 5L PSL2 X 80 SAWL Line Pipe (Coating shop) for The Third Line of UZBEKISTAN-CNPC Gas Pipeline Project in Baosteel Shanghai including Process humidity and temperature monitor, Holiday test, DFT measurement, coating inspection and final marking, package and shipment.


2013:

Fort McMurray SAGD plant: 2013 spring overhaul inspection, optimization of U1 unit per API 510 and API 570.

Fort McMurray SAGD plant: 2013 spring overhaul inspection, optimization of U5 unit per API 510 and API 570.

Fort McMurray SAGD plant: 2013 spring overhaul inspection, optimization of U8 unit per API 510 and API 570.

Fort McMurray SAGD plant: 2013 spring overhaul inspection, Tank farm per API 653 and API 570.

Snowy Owl TAR inspection for Syncrude 2013 upgrading hydro processing unit of 9-3 including anti-corrosion protective internal and external coating per NACE or SSPC codes on transfer lines, replacement and new installation on air pre-heater and steam generator, USTT on reformer (fired heater) tubes, and repair on the leaking convention section tubes designed @ 1600F.

Snowy Owl TAR inspection for Syncrude 2013 upgrading hydro processing unit of 15-2 including anti-corrosion protective internal and external coating per NACE or SSPC codes on transfer lines, replacement and new installation on air pre-heater and steam generator, USTT on reformer (fired heater) tubes, and repair.

Snowy Owl TAR inspection for Syncrude 2013 upgrading hydro processing unit of 11-1 including anti-corrosion protective internal and external coating per NACE or SSPC codes on transfer lines, replacement and new installation on air pre-heater and steam generator, USTT on reformer (fired heater) tubes, and repair.

Snowy Owl TAR inspection for Syncrude 2013 Tank Farm.

Internal training of API 570.

Conducted inspection and supervision of maintenance piping inspection on upgrader and utility / offsite plants.


2012:

Internal training of API 653.

Conducted spring overhaul inspection and supervision of SPOOLS manufactured according to ASME B 31.3 on behalf of owner at factory of JACOBS located at Edmonton.

Husky Rainbow Lake natural gas plant: Spring overhaul, pressure vessel inspection standard according to API 510.

Husky Rainbow Lake natural gas plant: Spring overhaul, tank inspection standard according to API 653&570.

Semcams GP natural gas plant: K3 Spring overhaul, pressure vessel inspection standard according to API 510.

Semcams GP natural gas plant: K3 Spring overhaul, tank inspection standard according to API 653.

Semcams GP natural gas plant: KA Spring overhaul, pressure vessel inspection standard according to API 510.

Semcams GP natural gas plant: KA Spring overhaul, tank inspection standard according to API 653.

FTMM site: field welding inspection of piles, per AWS D1.1/CSA W47.1 & W59 standard.


2011:

Internal training of API 653.

Overhaul for Syncrude upgrading: Smelting factory shutdown inspection on hydrogenation reactor, high temperature furnace, heat exchanger and pipe intersection.

FTMM Spring overhaul inspection for PCL.

FTMM Spring overhaul inspection for Edex.

FTMM Spring overhaul inspection for Horton Chicago Bridge & Iron.

FTMM Daily inspection for pressure vessels.


Exam and Training Schedule

2024 API ICP Individual Qualification Exam and Training Schedule
Exam Date Exam Name Exam Fee (US$) Exam Apply Deadline Training Duration Training Fee (RMB)